About Mit-Ra

The Mit-Ra Knowledge Base Industries is the first creative project of the United Health Group1 in the area of converting Non-drinkable water into fresh water. The research team and the economic and environmental analysis of the considered countries has begun to work under surveillance of the Georgia University2 of America since August 2015. The focus of the Mit-Ra Industries is to look into the future and finding the problems facing humanity. To prevent global warming there is no irreversible energies and Fossil fuels to use in this project. We want to launch freshwater refinement and sale sites in more than 700 cities around the world that face the problem of water scarcity. Our goal is to create a profitable and early yield Business in the production of freshwater with the lowest rate of pollution and using renewable and green energies. We don’t think just about profitability, we want to make the world a better place to live.

Mit-Ra Roadmap

 
  • 2014 February 19 The beginning

  • The idea of setting up small centers to convert sewage and municipal wastes into drinking water was first introduced by Dr. Willard Con.
  • 2014 April 19 The first innovation

  • Patent of carbon pipes for continuous movement using new Nano fiber technology. The Intelligent Recycling patent for upgrading the reverse osmosis filtration to 98%.
  • 2014 September 19 Everything became serious

  • Launch the Mit-Ra project approved by the UnitedHealth Group. Mit-Ra Industries brand registration and business planning and strategy development by Dr. John Dobbin.
  • 2015 August 19 Start the research

  • The central team in Cape Town began research and data collection in more than 35 countries. The purpose of this study was to identify countries that have a problem with drinking water shortage and to analyze the best position for launching the Mit-Ra sites.
  • 2016 July 19 We created Ai-Mit

  • Programming the Ai-Mit smart software. Based on SQR-AI02 Artificial intelligence.
  • 2016 December 19 Everything was ready

  • Complete the Ai-Mit software, synchronize the smart assistant system with the information network and connect to the Mit-Ra site’s physical platform.
  • 2017 January 19 The great patent

  • The first physical and chemical quality of water analyzes device(Error :0.002%) and 8 separate sensors that analyzing more than one cubic meter of water in less than 5 seconds and sending the information to the lab.
  • 2017 March 19 The main experiment

  • Launch the completed trial version (physical platform plus full water purification equipment and also connection to the software and send water information by Blockchain technology to the Georgia University Laboratory for analysis)
  • June 19 The contracts

  • Contract with Dubai Municipality (UAE) to set up Mit-Ra’s site and opening credit fund at Emirates NBD Bank. Guaranteed initial capital of $4 million. We co-operated with the East Rand Mine in South Africa through the Emirate Stock Exchange. Complete the final information from the countries & initial contract with…
  • 2018 February 19 Website & Smart contract

  • Design and construction of website and smart contract to raise capital through the sale of tokens (proof of stocks). Design of selling Token strategy and Business valuation. Completed the White Paper.
  • 2018 August 19 The Crowdsale

  • Start ICO Crowdsale. After the ICO, no coins will be issued, so any inflation is ruled out. The token will use a smart contract written in the Solidity language. The principle of open and transparent funds distribution will be observed. (Soft cap: $10M & Hard cap: $24M)
  • 2019 January 19 The first operational phase

  • Launch the first operational phase of the Mit-Ra sites in the UAE and South Africa based on the capital absorbed at the ICO stage. The Mit-Ra Industries Road Map is designed in 4 phases and 8 stages. Refer to White paper for a detailed study of the steps and schedules.
Read Less