ARNO
- The solution we offer based on carbon nanomaterials affects the structural characteristics of the active mass of the electrode.
If our carbon-based materials has been added to the Negative & Positive Active Material (NAM & PAM) during paste preparation in a variety of forms including MWNT and exfoliated graphite based graphene structures, when incorporated at 0.1-0,8% w.r.t. lead oxide, carbon increases the charge acceptance of a battery by more than 200% but at the cost of paste rheology and paste density. Reductions in paste density directly lead to increased active material adhesion to the grids, increased battery capacity with no requires of higher active material masses to reach specification, and sufficient cold-cranking performance.
New paste processing machinery is often required to overcome some of the issues brought on by high carbon loading. Our proposed carbon-based materials are easily incorporated into battery pastes as a concentrated, pourable fluid or paste. The fluid or paste replaces a portion of the water used during the paste mixing process, requiring no alteration to existing industrial production lines. When combined with traditional paste ingredients (lead oxide, expander, fiber, water, and acid) at 0.36% w.r.t lead, our new advanced materials offer prolonged increases in charge acceptance and more efficient battery usage with no detrimental effect to paste rheology or Reserve Capacity (RC), and an augmented Cold-Cranking Ability (CCA)
Features
- Conductive components of battery electrodes;
- Rheology modifiers for pastes and slurries used in preparation of battery electrodes;
- Structural and porosity modifiers for battery electrodes;
- Capacitors for charge storage.
Technical Info
- Our proposed technology for the use of carbon materials positively affects the process of active masses of the electrodes charging at the serial complete batteries.
ARNO Roadmap
- August 2020 - Token Creation
- October 2020 - PR company launch
- JANUARY-FEBRUARY 2021 - Legal registration of the company
- MARCH-APRIL 2021 - Site selection for future production facilities
- APRIL-MAY 2021 - Obtaining the necessary permits and, if necessary, licenses to set up production
- JUNE 2021 - Approval and order of a plant for the production of carbon nanotubes for 1 kg. h.
- JULY 2021 - Approval and order of a graphene production plant for 1 kg. h.
- AUGUST 2021 - Approval of independent testing by manufacturers and third-party laboratories
- SEPTEMBER 2021 - Purchase of similar unms for transfer to third-party manufacturers and laboratories for independent testing
- OCTOBER 2021 - Creating end product designs for various applications (home, industrial, technical)
- NOVEMBER 2021 - Creation of design and technical documentation for installations for the production of nano-carbon materials for the design of industrial and technical infrastructure facilities
- DECEMBER 2021 - Approval of design and technical documentation for buildings and structures of industrial and technical infrastructure
- JANUARY 2022 - Start of work on the second prototype in semi-industrial design. Building a bridge between Erc20 and Bep20.
- FEBRARY 2022 - Expansion of the list of cryptocurrency exchanges where transactions with ARNO are available.
- MARCH 2022 - Start of working testing of the second prototype, including the independent structures.
- APRIL 2022 - Submission of intermediate products - additives for creating a new generation of lead-acid batteries - for certification.
- MAY 2022 - Launching a real production of supplements and starting a marketing campaign to promote the product.
- JUNE 2022 - Supply of the final product - a 12-15 kW storage device based on a new generation of lead-acid batteries - for preliminary certification.
- JULY 2022 - Refinement of design models and technological documentation for drives for home use.
- AUGUST 2022 - Development of technological schemes for real production according to preliminary requests.
- SEPTEMBER 2022 - Obtaining completely finished documentation for the line for the production of our own CNM and preparation of areas and communications.
- OCTOBER 2022 - Start of production of our own line for obtaining MW-CNT.
- NOVEMBER 2022 - Start (if possible) of the main stage of certification of the final product.
- DECEMBER 2022 - Start of a marketing campaign to promote end products - targeting and marketing.
- JANUARY 2023 - Start of the creation of a working network for the distribution of end products.
When buying 300 and 1499 coins + 3% bonus
When buying 1500 and more coins + 5% bonus
Type: Utility-token
Token standard: ERC20
Token price in USD: from August 16 to 22 is $ 2.5 and from August 23 to 29, $ 3.